CORPORATE

LINKS

F A Q

     CONTACT US

Click for information on PorterCorp's frame & panel solution for floodplain housing

HVAC ducts are placed in the stick-built parts of the PorterSIPs home

HVAC Notes

In the event plumbing or HVAC ductwork is to be run along a SIP wall, a chase can be built that will both conceal and protect the run.  See drawing 38-701. Wherever possible, ductwork can be routed through the stick-built (interior) sections of the home.
To help prevent, and to reduce the rate of spread of, fire, the inside surface of SIP panels, which face living areas, must have ½" or thicker gypsum board OR equivalent installed. Code requires a 15 minute thermal barrier on the inside surface of panels in residential structures. Local code requirements vary and may require additional fire prevention measures.
W.H. Porter, Inc. also manufactures a one-hour rated panel which carries the UL Classification Mark and is listed as Design Co. U532. This panel is a 6 1/2" (5 7/16" EPS core), Type A ( 7/16" OSB face both sides).
Composite Wall & Roof Building Panels
Copyright: 07/26/2006